Skip to main content

Quote/Estimate (Add - Edit)

How to add a Quote then Save as Quote OR Save as Estimate

Austin Rasmussen avatar
Written by Austin Rasmussen
Updated over 2 months ago

This Help Article covers:

General/Overview:

⚠️ NOTE: Quotes/Estimates are added from a Job, I.E. the Job must have been added first. For more information on adding a Job, see the Help Article: "Jobs (Add - Edit)"

Quotes and Estimates are displayed in the Quotes List of the Side Menu's Quotes and the Quotes Top Tab of a Job Window.

Quotes can be built using Manual Sections (Quote Side), Plan Sections (Visbuild Side), or a combination of both.

💡 TIP: The Icon on the left of a Quote's Section tells you if a Section is a Manual Section (Quote Side) or Plan Section (Visbuild Side).

To Enable a User to Add or Edit a Quote

For a User to be able to Add or Edit a Quote they need to be enabled on the Katipolt Desktop side. To do this they need to be added to a Katipolt Role with permission “Add/Edit Quotes” toggled to "On".

Company Settings > Staff Top Tab > Roles Expandable Section > Select a Role that displays Katipolt “Add/Edit Quotes” toggled to "On" OR from a Role toggle it to "On" > then select the person from the “Assigned To” dropdown to add

⚠️ NOTE: Toggling "Add/Edit Quotes" to "On" also toggles "View Quotes" to "On". You can Toggle just "View Quotes" to "On" which allows a User to View Quotes, but not Add or Edit a Quote.

💡 TIP: Toggling "View Quotes" to "Off" hides the Dashboard Key Information Chart or Tiles related to Quotes.

To Add a new Quote

Adding a Quote is done from the Quotes Top Tab of a Job Window.

Quick Flow:

  • Job: XXXX Window

  • Quotes Top Tab

  • [ADD]

  • Quote Details

  • [SAVE]

1. From a Jobs: XXXX Window, Press the Quotes Top Tab to display the Quotes Expandable Section, then Press the [+ADD] button to display the New Quote Window

2. From the New Quote Window Check/Edit Quote Details, then Press [SAVE] to save.

To Add a Quote Manual Section (Quote Side)

Adding a Quote Manual Section is done from the Quote Window (Quote Side).

Quick Flow:

  • Quote: XXXX Window

  • [+ADD MANUAL SECTION]

  • Section Name*

  • [CONFIRM]

1. From the Quote: XXXX Window;

  • Press the [+ADD MANUAL SECTION] to display the "Add new manual section" popup

  • Enter a “Section name*

  • Check/Edit the Section "Brand*

  • Enter a "Description" (Optional)

  • Press [CONFIRM] to display the Quote's new Manual Section where you can Add Kitset/Product Quote Lines, or Ad Hoc Lines to build your Quote. For more information on this see the Help Article: "Quote Manual Sections (Add - Edit)"

To Add a Quote Plan Section (Visbuild Side)

Adding a Quote Plan Section is done from the Quote's Visbuild Window (Visbuild Side).

⚠️ NOTE: When opening the Quote for the first time, you need to do a [SAVE] to liven the [OPEN IN VISBUILD] button.

Quick Flow:

  • Quote: XXXX Window

  • [OPEN IN VISBUILD]

  • Section Name*

  • [CONFIRM]

1. From the Quote: XXXX Window;

  • Press [OPEN IN VISBUILD] to open the Visbuild Browser Tab where you can upload your plan and Add Kitsets or Quote Lines to build your Quote. For more information on this see the Help Article: "Quote - Plan Sections from Visbuild (Add - Edit)"

To Save Quote as Estimate/Estimate as Quote

Estimates are first created as Quotes, then can be Saved as Estimates.

A Quote/Estimate can be Saved to change a Quote to an Estimate OR an Estimate to a Quote.

1. From a Quote/Estimate's [SAVE] button, Press the dropdown options to display Option "Save as estimate" OR "Save as quote", then Select the Option to suit

⚠️ NOTE: When saving a Quote as an Estimate, the Estimate PDF now follows the Estimate default wording. When saving an Estimate as a Quote, the Quote PDF now follows the Quote default wording. Any editing at the Quote/Estimate's "Document Wording" will be lost on the save of a change.

⚠️ NOTE: When saving as a Quote, invoicing is done by Progress Claiming the Quoted amounts either by $ value or % value. When saving as an Estimate, invoicing is done as a Charge Up Invoice (displaying Costs to Date as Labour and Product lines)

To Edit the Quote/Estimate

Open the Quote, then either:

  • Make changes, the Save again,

  • Unlock, make changes, then Save again, or

  • Unaccept, make changes, then Save again

⚠️ NOTE: If the Quote/Estimate has been Accepted and has a Progress Claim/Charge Up Invoice and/or a Variation added, the Quote/Estimate cannot be Unaccepted.

Did this answer your question?